Customization: | Available |
---|---|
Length: | 25m/Roll |
Max Current: | 12A |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
.Free crimp or cut
.Small size-It's only 14mm wide;Easy access to power
.Reasonable structure
.Beautiful after installation
.Stable and durable
.Uniform luminescence
|
|
[Product Model] Track | [Section size] 14*3mm |
[Carrying current is not more than] 12A | [Slot size] None |
[Voltage range] 12v-36v DC | [Material] Rail material rubber magnetic strip and copper |
[Installation method] Suction type installation | |
[Normal color] The Power Track color is black only | |
[Regular length] 25m/roll or customized length | |
Input end with 500mm long UL black wire |
[Product Model] Guide plug | [Section size] 32*15mm |
[Carrying current is not more than] 3A | [Slot size] None |
[Voltage range] 12v-36v DC | [Material] PC material + copper material + magnet |
[Installation method] Suction type installation | |
[Normal color] Black / White | |
[Regular length] 0.35m/0.5m Other lengths can be customized | |
l Input end with 300mm long 21.5 square UL red and black wire |
Free cut | Free crimp | Length can be customized | Back magnet |
1.Can be directly adsorbed on the shelf,and double-sided tape can be added to the back of the non-magnetic surface 2.The Flexible Power Track is equipped with a magnetic plug, which can be connected to any position of the power track. |
Cutting: cutting the length of guide rail according to demand; Install the input end and the tail end on the guide rail; Align the guide rail with the surface of the showcase to be installed, the installation surface must be iron (non-magnetic surface installation need to add double-sided tape), the guide rail through the above magnetic strip automatically sucked on the mounting surface; Connect the input power line: first connect the guide rail input line to the corresponding positive and negative terminals of the power supply according to the positive and negative terminals marked on the power guide rail; Insert the plug to access the power supply on the guide rail. |
Trade Terms
1. Payment: orders 100% payment advance by Paypal, Western Union, the company account ,T/T
2. Bulk Order: T/T 30% advance 70% before shipping
3. Delivery time: Samples/small orders 5-7days Mass order: 7-15days
Packing & Shipping Terms
Packing with Cartoon
1. FedEx/DHL/UPS/TNT for Door-to-Door;
2. By Air or by Sea for mass goods, for FCL; Airport/ Seaport receiving;
3. Customer specified freight forwarding mode of transport
Since 2008 Armor lighting step into the led lighting industry and focus on shelf and retail display lighting area .
Armor very experienced and advantageous in products customizing and considering more for our customers.
Q1: What is your minimum order quantity?A:Usually MOQ is 50m, but we also accept small order for trail.
Q2:Is a free sample order available?
A: Of course, you can check our quality before ordering.If you have any requirements, please contact us.
Q3:How long of the lead time?
A: Usually,our lead time is 7-10 working days.It depends on the order quantity.But if the order is urgent, we can apply for urgent production.Bulk ordering takes 20-25 days.
Q4:Can LED strip be customized?
A:Sure,we can produce as your requirement such as LEDs,power,length and waterproof level.We also offer OEM&ODM.
Q5:What's your warranty?
A:We have 3 years and 5 years warranty